VertiCu DesignBUILDING JOYFUL SPACES

Before we begin,
a few things only you can decide.

These are not design questions. They are scope questions. Your answers tell us what we are touching, what we are leaving alone, and what we can realistically finish in the time we have. About ten minutes.

Why we are asking now

Once we have this, you get a proper proposal: fixed scope, costing, timeline and payment stages. Handover target is 31 October 2026, and ordering cannot begin until the design is frozen.

If you are unsure, skip it

Leave anything blank and we will walk you through the options in person.

Please go through each area
1Entrance foyer The small entry before the living room

Is the foyer part of this project?

Console and shoe storage

Artwork and nameplate

2Living and dining One open volume

The existing wall moulding

Flooring and ceiling stay as they are. Everything on the walls is open to us.

Is there anything in the living or dining that must stay?

Existing furniture, a piece of art, a unit, anything sentimental.
3TV wall and mandir Position is already broadly settled

How far do you want us to take the design?

Does the mandir have to stay exactly where it is?

Anything the mandir must accommodate?

Doors or shutters, storage for samagri, space to sit, a specific idol size, direction.
4Powder bathroom

Is it part of this project?

If yes, what happens to the existing tile?

The WC and basin

5Your brother's bedroom Designed in full

The wardrobe

Bed, headboard and bedside tables

A made-to-order bed takes 45 to 60 days from the day it is ordered. If ordering starts after 20 September, it will not arrive by 31 October. A ready piece will.

Anything your brother specifically needs in the room?

A study or work desk, extra storage, a TV, gym or gaming setup, a reading corner.
6Your brother's bathroom

Is it part of this project?

If yes, how far do we go?

7Furniture, curtains and decor Billed separately from the built work

What we should handle

Tick everything you want us to take on. All of it is bought, sourced or customised rather than built on site.

How do you want to select these?

8Decisions and dates The part that decides whether the date holds

Who signs off on design decisions?

How fast can you come back on an approval?

The timeline only works if approvals move quickly. This is usually what decides whether a handover date holds.

Is 31 October a hard date or a preferred one?

Is there anything else you want covered?

The terrace is deliberately left out and treated as a later phase.

When you have finished

Tap the button. Your answers are copied automatically and WhatsApp opens with them already written.

If anything is easier to just say out loud, send a voice note instead. That works perfectly well.

Questions at any point
+91 81974 36391 · 8383863337
VertiCu Design · projects.verticu@gmail.com